Advertisements
concrete formwork with cheap price
| Price: | US$ 45 |
|---|---|
| Minimum Order: | 100pieces |
| Payment Terms: | 30% down payment by T/T,the balance will be paid b |
| Port of Export: | shanghai port |
Product Details
| Model No.: | BZ-PP-12/15/18/20 | Brand Name: | BEIZHU |
|---|
| Certification: | ISO9001:2008 |
|---|---|
| Specification: |
HS Code:3925900000
Colour:Grey Raw Material:polypropylene Durability:≥80 times Standard size:1220mmx2440mm(8ftx4ft) special size:max length : 3meters ; max width:1220mm Thickness:12/15/18/20mm weight:8kg/m° Strength:80KN/m° Easy dismantled:no requiring any releasing agent Easy storage:even in damp places Easy cleaning:cleaned just with water(waterproof) |
Packaging & Delivery
| Packaging: | pallet |
|---|---|
| Delivery/Lead Time: | 10-30 working days after receiving the payment |
| Production Capacity: | 50000/month |
Product Description
1.PP column formwork with Light weight, high strength, high hardness, impact resistance, wear resistance.
2. Surface is smooth, bright and clean; Casting molding effect is good.
3.No absorption of moisture, no deformation, no mildew; Long-term immersion stratification in the water, no bubbles, sheet size stability, especially suitable for underground and damp environment.
4. Good toughness. Can be used to make other different shapes and size formworks.
5. Acid and alkali resistance, corrosion resistance; Very suitable for the engineering application in coastal areas, mine, as well as seawall. It is need not do any preservative treatment both in using and storing the formworks, which do not pollute the concrete surface.
6. The times of PP column formwork can reach more than 60 times, long service life.
7. Waste products can be recycled and reprocessed, making full use of waste materials, This property can greatly reduce the project cost, compared with wooden formworks and bamboo formworks.
8. Environmental protection and energy saving, no pollution.Without any poisonous or harmful gas.
9.PP column formwork demould easily. No need brushing release agent, only tapping, the formworks will fall off. Shorten working hours and speed up the construction schedule efficiently.
10. Easy to process. Sawing, drilling and nailing are all available. Formworks can be combined vertically and horizontally optionally.
11. Easy to remove. Removing is convenient, quick and safe, and the supporting is also easy to operate, advantageous to the organization construction, effectively improving the construction schedule.Save cost up to 50%.
|
SUPPLIER PROFILE
|
|||
|---|---|---|---|
| Company: | beizhu radiator trade company | ||
| City/State | taiyuan, shanxi | Country: |
China
|
| Business Type: | Export - Manufacturer / Trading Company | Established: | 1988 |
| Member Since: | 2017 | Contact Person | kevin liu |
SUPPLIER PROFILE
City/State/Country -
taiyuan, shanxi
China 

Business Type -
Export - Manufacturer / Trading Company
Established -
1988
Member Since -
2017
Contact Person -
kevin liu


