Global Trade Hub QUICK FIND
trade hub
freight cargo shipping directory
trade shows and exhibitions
Advertisements
Factory customized Highway construction 150 ton overhead launching girder equipment
scroll left
  • Factory Customized Highway Construction 150 Ton
  • Factory Customized Highway Construction 150 Ton
  • Factory Customized Highway Construction 150 Ton
  • Factory Customized Highway Construction 150 Ton
  • Factory Customized Highway Construction 150 Ton
  • Factory Customized Highway Construction 150 Ton
scroll right

Factory customized Highway construction 150 ton overhead launching girder equipment

Price: US$ US $5,000-50,000 / Set / Set
Minimum Order: 1 Set/Sets
Payment Terms: T/T, L/C, T/T+L/C
Port of Export: Qingdao, Tianjin or Shanghai, China
Product Details
Model No.: LG Brand Name: Huada Heavy Industry
Certification: ISO CE SGS GOST
Specification: Condition: New
Application: Bridge erection
Rated Loading Capacity: 150t
Rated Lifting Moment: 1500kn
Max. Lifting Load: 150t
Max. Lifting Height: 60m
Span: 30m to 50m
Place of Origin: Henan, China (Mainland)
Brand Name: Huada Heavy Industry
Model Number: LG
Certification: ISO CE SGS GOST
Warranty: 18 Months
After-sales Service Provided: Engineers available to service machinery overseas
Product Name: Highway construction 150 ton overhead launching girder equipment
Wind alram system: Yes
Safety device: Included
Voltage lower protection: Yes
Working duty: A3
applied angle: 45®
adaptive cross slope: 2.50%
Maximum longitudinal slope: ≤7%
Maximum Transverse slope: ≤5%
Erection method: span by span
Packaging & Delivery
Packaging: main beams are packaged by plastic woven cloth for launching gantry.
Delivery/Lead Time: shipped in 40 days after receving prepayment
Production Capacity: 50 Set/Sets per Month
Product Description
Product Description
Highway construction 150 ton overhead launching girder equipment is generally used in the erection of the Highway Bridge and Subway Bridge, using the precast segmental prestress concrete box beam (PC beam) assembly. The main feature is the high efficiency of construction and self-traveling. Generally it is composed of the main beam, leg and winch trolley, the main girder is used for bearing, the leg is to execute machine transverse moving, longitudinal moving, leveling, support, cross span, cross scale and other functions, and the winch trolley used for lifting the precast girder.

Packing & Delivery
Packing
1. Electric parts are packed by high quality plywood crate, to reduce distortion in conveying;
2. Main beams, end beams and electric hoist are packed by plastic woven cloth. It can reduce abrasion when transport.

Delivery
1.If the size of Highway construction 150 ton overhead launching girder equipment are suitable for container ship, usually by container;
2.If the size is too big, usually by bulk ship or by container after truncation; Transport ways are based on reducing cost for you and keep the crane performance.

Delivery time
Within 30 to 40 working days after the receipt of deposit.

Transportation
Generally 35 days to 50 days to destination port.


FAQ

1. What’s the information should I provide when inquiry about the highway construction 150 ton overhead launching girder equipment?
a .we need the Bridge Drawing;the Maximum longitudinal slope and the Maximum Transverse slope;
b. The Girder/beam drawing;

2. How many Personnel and equipment to assemble launching gantry in the worksite we need?
Personnel: 8 to 10 workers equipment:
Truck crane> 50 t :2 sets
Φ19.5 steel wire rope 8 m: 4 ropes
Sleepers:several
Electric welding machine: 1 set
Oxygen, acetylene:1 set
Hammer(12 pound and 8 pound):1 set for each
Wrench and pincher: several
Gradienter: 1 set

3.What are inspection standard for load test of highway construction 150 ton overhead launching girder equipment?

a. Dynamic load test
1.1 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overhead.

b. Static load test
1.25 times rated load, all mechanisms work well, the crane stops 20 min to 30 min as trial load is lifted 10 cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation.

4.How to make highway bridge concrete girders?
a. Full span prefabrication.
b. Segment girder prefabrication.
c. Full span cast in place girder.
d. Segment cast in situ.

5.How about maintenance of highway construction 150 ton overhead launching girder equipment?
a. Lubricating. b. Steel wire rope. c. Spreader. d. Pulley block. e. Wheels. f. Brake.
Factory customized Highway construction 150 ton overhead launching girder equipment
Factory Customized Highway Construction 150 Ton
Factory Customized Highway Construction 150 Ton
Factory Customized Highway Construction 150 Ton
Factory Customized Highway Construction 150 Ton
Factory Customized Highway Construction 150 Ton

SUPPLIER PROFILE
Company: Huada Heavy Industry
City/State Xinxiang, Henan Country: China  
Business Type: Export - Manufacturer / Trading Company Established: 2008
Member Since: 2017 Contact Person Steven Tian
SUPPLIER PROFILE
City/State/Country -
Xinxiang, Henan
China  
Business Type -
Export - Manufacturer / Trading Company
Established -
2008
Member Since -
2017
Contact Person -
Steven Tian