Global Trade Hub QUICK FIND
trade hub
freight cargo shipping directory
trade shows and exhibitions
Advertisements
Elevator Dispatching Control System Grande PCBA Manufacturing - China PCB Assembly Factory‎
scroll left
  • Elevator Dispatching Control System Grande PCBA
scroll right

Elevator Dispatching Control System Grande PCBA Manufacturing - China PCB Assembly Factory‎

Price: US$ 1 / Piece
Minimum Order: 1PCS
Payment Terms: TT
Port of Export: Shenzhen
Product Details
Model No.: pcba-9 Brand Name: greattong
Certification: ISO90012015
Specification: Supplier: Shenzhen Grande Electronics
Layers: 4
Application:Elevator Dispatching Control System Grande PCBA Manufacturing - China PCB Assembly Factory‎
PCB:FR-4/1.6mm, 1oz finished copper
Surface Treatment: HASL
PCBA Lead time: 3-4 weeks
Packing: Anti-static bag and compartmental packing
Standard Warp: <0.75%
Packaging & Delivery
Packaging: Anti-static bag and compartmental packing
Delivery/Lead Time:  3-4 weeks
Production Capacity: 120,000,000
Product Description
1, Turnkey solution for Elevator Dispatching Control System Grande PCBA Manufacturing - China PCB Assembly Factory‎.
2, PCB Assembly, PCB fabrication / PCB layout, PCB re-layout.
3, Electronic Contract Manufacturing.
4, SMT&DIP&PTH&BGA.
5, Components Sourcing.
6, Quick PCBA prototype.
7, X-ray test, the Internal Circuit Test (ICT) , Functional Test (FCT)
8, Sample and small batch order are accepted.


PCBA Service
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:
0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP 
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on. 

PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
Mass production: partial delivery according to the customer’s requirement.

Other information for PCBA
1, The mass production will be arranged after PCBA prototype confirmed. 
2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
3, EPE is used to avoid impact and crash.
PCBA Standard Packing
Anti-static bag and compartmental packing
Elevator Dispatching Control System Grande PCBA Manufacturing - China PCB Assembly Factory‎

SUPPLIER PROFILE
Company: Shenzhen Grande Electronic Co., Ltd
City/State Shenzhen, Guangdong Country: China  
Business Type: Export - Manufacturer / Trading Company Established: 1998
Member Since: 2018 Contact Person Eileen Wong
SUPPLIER PROFILE
City/State/Country -
Shenzhen, Guangdong
China  
Business Type -
Export - Manufacturer / Trading Company
Established -
1998
Member Since -
2018
Contact Person -
Eileen Wong