Advertisements


Consumption Metering Surface Mount SMT PCB Assembly Service - Grande
Price: | US$ 1 / Piece |
---|---|
Minimum Order: | 1PCS |
Payment Terms: | TT |
Port of Export: | Shenzhen |
Product Details
Model No.: | pcba-5 | Brand Name: | greattong |
---|
Certification: | ISO90012015 |
---|---|
Specification: |
Supplier: Shenzhen Grande Electronics
Layers:4 Application:Consumption Metering Surface Mount SMT PCB Assembly Service - Grande PCB:FR4/1.6mm/1oz Min Via: 0.2mm Surface Treatment: HASL PCBA Lead time: 3-4 weeks Testing: 100% E-test Standard Warp:<0.75% |
Packaging & Delivery
Packaging: | Anti-static bag and compartmental packing |
---|---|
Delivery/Lead Time: | 3-4 weeks |
Production Capacity: | 120,000,000 |
Product Description
Grande offers printed circuit board assembly services from PCB Prototype Assembly to Low-Middle-Large volume PCB Assembly, Consigned PCB Assembly to Turnkey PCB Assembly.
Sicne we provide custom PCB fabrication and components procurement services, then you no need to worry about the disconnection of the fabrication and assembly proccess. Besides, you will experience lower overall PCB project costs and increase the likelihood of meeting your project deadlines, while also being able to have more time and energy to focus on and optimize your PCB design.
Our PCB assembly service adheres to ISO 9001:2008-certified, RoHS compliant. We can also handle SMD, through-hole and mixed assembly projects. capabilities.
Free Quotation is always available, just send us your Gerber, BOM & PCB Manufacturing Requirements to evaluate, we'll quote within 1-3 working days around;
PCBA Service
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.
PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:
0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on.
PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ confirmed.
Mass production: partial delivery according to the customer’s requirement.
Other information for PCBA
1, The mass production will be arranged after PCBA prototype confirmed.
2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
3, EPE is used to avoid impact and crash.
PCBA Standard Packing
Anti-static bag and compartmental packing
SUPPLIER PROFILE
|
|||
---|---|---|---|
Company: | Shenzhen Grande Electronic Co., Ltd | ||
City/State | Shenzhen, Guangdong | Country: |
China ![]() |
Business Type: | Export - Manufacturer / Trading Company | Established: | 1998 |
Member Since: | 2018 | Contact Person | Eileen Wong |
SUPPLIER PROFILE
City/State/Country -
Shenzhen, Guangdong
China 

Business Type -
Export - Manufacturer / Trading Company
Established -
1998
Member Since -
2018
Contact Person -
Eileen Wong